Should You Move Out During a Whole Home Remodel in St. Petersburg?

Revolution Contractors
Revolution Contractors
July 27, 20268 min read
Whole home remodel underway in a St. Petersburg house

Short answer: for a true whole-home remodel, yes. Almost every client we work with in St. Petersburg ends up living somewhere else during construction, and the ones who try to stay usually wish they hadn't. A whole-home remodel is different from a kitchen refresh or a single-bathroom update — the crew is in every room, water is off for stretches, dust travels through open framing, and inspectors are cycling through on a schedule your household can't dictate. If the project is smaller than that — one or two rooms, contained scope — staying in the house is often fine. This guide walks through where that line is, what it costs to move out for six to nine months, and how to plan the transition so you're not paying two housing bills longer than you have to.

The Direct Answer from Our Owners

Jeremy Bonnewell, one of Revolution's owners, put it directly in a January interview: "Homeowners don't live in the house during a full remodel — it's not practical and they'd be in the way." He said the same thing a different way when talking about how invasive the work gets: "We try to give people an accurate representation of how invasive it'll be even if they're living in a rental."

That's not marketing polish. It's the pattern he's seen across two decades of jobs in St. Pete. The rare exception is a retiree who plans a long vacation to line up with the construction window. Everyone else finds a rental, moves in with family, or negotiates an extended stay somewhere. Once the demo starts, the house isn't a house — it's a jobsite with an address on it.

Where the Line Is: Remodel vs. Renovation vs. Refresh

The rule of thumb we use with clients:

  • Refresh (paint, floors, one room): Live in the house. Set up a clean zone. The crew works around you and the mess is contained.
  • Single-room remodel (a kitchen or a bathroom): Usually livable. Kitchen remodels mean eating out or using a microwave setup for a month or three. Bathroom remodels are easy if you have a second bathroom.
  • Two-room remodel or a large addition: Depends on which rooms and whether the systems (plumbing, HVAC, electrical) get pulled back. Livable in some cases, miserable in others.
  • Whole-home remodel: Move out. Every time we've had a client insist on staying, the second half of the project got ugly.

Jeremy also flagged the single-bathroom case specifically: "How do you handle homes with only one bathroom during construction? Typically those people are not going to stay in the house." If the house has only one functional bathroom and it's part of the scope, the decision is made for you.

Why St. Petersburg Makes the Decision Harder

Three St. Pete factors push more people toward moving out than they'd expect:

1. Older housing stock hides surprises. A lot of our whole-home jobs are pre-1980 houses in Old Northeast, Historic Kenwood, Snell Isle, or the Coffee Pot / Euclid neighborhoods. Cast-iron drain lines, cloth-wrapped wiring, questionable framing repairs from decades of previous work — these show up during demo and can shift the schedule. If you're living in the house, every one of those surprises is a conversation over dinner instead of a phone call to a rental.

2. Flood-zone work adds systems downtime. If the house sits in an AE or VE zone and the scope crosses the FEMA 50% threshold, the project turns into an elevation project. Water and power get pulled back further and longer than a normal remodel. That's a hard "no" on staying.

3. Historic-district approvals stretch the calendar. Homes inside St. Petersburg's local historic districts get an extra Certificate of Appropriateness review on top of Pinellas County building permits. Both close-outs run in parallel, and the schedule is only as fast as the slower of the two. A whole-home historic remodel in Old Northeast can run 12-15 months from pre-construction to final walk. Living in that for a year is a lot.

How Revolution Phases a Whole-Home Remodel

Understanding the phasing helps you understand why staying in the house rarely works. From Jeremy's process notes:

  1. Pre-construction (3-6 months). Design, engineering, permit application, selections, and budget sharpening. The house is still yours to live in — nothing is torn up yet.
  2. Permitting (3-6 months, overlapping the tail of design). A large addition/remodel between $100K and $500K typically takes one to two months in Pinellas permitting, but stamped plans and structural review can add several months upstream. Nothing on-site changes.
  3. Demo. First week the house becomes unrecognizable. This is when most families realize they've made the right call by moving out.
  4. Foundation and framing changes. Structural rework, any additions, layout shifts.
  5. Rough-in of the trades (MEP: mechanical, electrical, plumbing). Water and power get repositioned; expect stretches with no water.
  6. Windows, doors, roof. Building envelope gets closed back up.
  7. Drywall and finishes. Cabinetry, flooring, millwork, then countertops, appliances, fixtures.
  8. Inspections and close-out. Superintendent schedules Pinellas inspections in order; if the property is historic, HPC final runs in parallel.

Whole-home construction runs six to nine months once demo starts, per Jeremy. Add the pre-construction and permitting window in front of that and you're planning around a 12- to 15-month total project.

Living-In Checklist If You're Determined to Stay

If you have a smaller-scope job and you want to live in the house, these are the questions to get answered before construction starts:

  • Which room is your "clean zone" and does it stay sealed off (plastic wall, zip-wall door, negative air) for the full project?
  • Which weeks will water be off? Which weeks will power be off to specific circuits?
  • Which bathroom stays operational at all times, and when does it get touched?
  • Is there a functional kitchen setup — even a temporary one with a microwave, fridge, and coffee maker — that stays out of the work zone?
  • What are the daily work hours, and who's your day-to-day contact on the crew?
  • Where does the porta-potty go? We put one on every job over a certain size so our crew and subs don't need to use your bathroom. Confirm placement.
  • What's the dust plan? HVAC filter changes, plastic barriers, and daily cleanup all matter more when you're sleeping there.

Move-Out Logistics and Rough Costs

For clients who move out, the common options in St. Pete:

  • Furnished monthly rental in the same neighborhood. Keeps kids in school and dogs in their routine. Expect $3,500-$6,500/month depending on neighborhood and bedroom count. Downtown and beach rentals run higher.
  • Extended-stay hotel or corporate housing. Simpler for shorter stints (three months or less) or for couples without pets. Predictable weekly rate.
  • Second home or family. If you have the option, it's the cheapest, but plan for the friction of a shared kitchen and shared calendar over half a year.
  • RV or ADU on the property. A few of our clients with lot space have parked an RV in the driveway and used the porta-potty and a temporary hose bibb. Works for a couple of months, not for a year.

Whatever you pick, budget the housing separately from the remodel budget and treat it as a fixed line item. We've had clients try to compress the schedule to save on rent — it never works and usually costs more in change orders than it saves in housing.

What We Ask Clients to Decide Before We Start

Before we sign the construction contract, we want three answers:

  1. Where are you living during the build? Signed lease or written plan. Not "we'll figure it out."
  2. What's your decision-making pace? A whole-home remodel is a non-stop stream of selections. Slower decisions push the schedule.
  3. Who's the point person from your household? One person owns the phone line to the superintendent. Committee decisions add weeks.

Jeremy's phrasing: "There's a non-stop barrage of questions and daily logs — total information flow both ways." That flow is easier to manage from a quiet rental than from the middle of the jobsite.

FAQs

Can I live upstairs while you remodel downstairs?

Sometimes, on a partial remodel. On a whole-home job, no — the trades work through all floors in sequence and the systems get pulled back building-wide. The one exception is a multi-story home with a fully separated in-law suite or ADU that has its own kitchen, bath, and mechanicals. Even then, we ask you to be honest about how much dust and noise you're actually willing to sleep through.

How long does a whole-home remodel take in St. Petersburg?

Pre-construction and design run three to six months. Permitting adds another one to six months depending on scope and whether it needs stamped structural drawings. Construction itself is six to nine months. So plan on 12 to 15 months from first design meeting to move-back-in for a typical whole-home job.

Do I need to move out for a kitchen-only remodel?

Not usually. A kitchen remodel runs one to three months. Most clients set up a temporary kitchen in the garage or dining room — microwave, fridge, coffee maker, some plates — and get through it. Eating out gets old faster than people expect, so plan a food budget on top of the construction budget.

What about a single-bathroom home?

If your house has one bathroom and it's in the scope, you're moving out for the duration of that bathroom's demo, rough-in, and finish work — usually three to six weeks even on a fast job. Some clients time this into a vacation. We've also had clients rent a nearby unit for the specific stretch when the bathroom is down.

Can you finish rooms in phases so we can move back in early?

Yes, on some jobs. We've phased whole-home projects to hand over bedrooms and a bathroom while the kitchen and living areas are still under construction. It's not free — phased completion means multiple punchlists, more inspections, and more site cleanup — but it can shave weeks off your rental. Ask us about it in pre-construction.

How do you handle dust, security, and the pets we're leaving behind?

Dust is managed with plastic barriers, negative air, HVAC filter changes, and daily cleanup. Security is managed with locked toolboxes, exterior door replacements timed for early in the day, and a superintendent who is on-site whenever crews are. Pets: we ask you not to leave animals in the house during work hours — it's stressful for them and slows down the crew.

Is a whole-home remodel worth it versus just moving?

Depends on your lot, your location, and how you feel about your neighborhood. In some St. Pete neighborhoods — Old Northeast, Snell Isle, Coffee Pot Bayou — remodeling a house you already own at $200-400 per square foot is cheaper than buying comparable finished square footage nearby. In other neighborhoods, the math flips. This is a conversation to have with your realtor before you talk to a contractor.

If you're planning a whole-home remodel in St. Petersburg or a Pinellas County neighborhood, see our home remodel service page or call (727) 888-6161 before you sign a rental lease or write a hotel deposit. We'll walk your scope, give you a realistic timeline for pre-construction, permitting, and build, and tell you honestly whether you can stay in part of the house or need to plan a full move-out.